Q: Parametric cost estimating involves
a) Defining the perimeters of the life-cycle
b) Calculating the individual estimates of the work packages
c) Using a statistical algorithm to determine work duration
d) Using the WBS to determine work duration
e) Both a) and d)
A: c)